Istanbul Power Plant
Turkey
Cattenom EDF Power Plant
France
Mantova Petrochemical
Integral retubing of the condenser nr 976 tubes CuNi 90/10 od 19.05 thk 0.90 mm x 4.883 mm long
El Aft Power Plant
Egypt
Workshops
Partial retubing of the condenser with no. 2,574 aisi 304 pipes od 25.00 x 1.25 4,650 length
Thermoelectric plant
Marghera (VE)
Thermoelectric plant
Escatron – Spain
Turbine condenser – Assembly and expansion of nr. 23,940 pipe ASTM A249 TP304L 22,740 od. 25.40 x 0.899 x 11,496mm 1,200 od 25.40 x 1.067 x 11.496mm
Thermoelectric plant
Portovesme (CA)
Desalinator battery
Integral retubing for a total of no. 8,500 Cu/Ni pipes o.d. 22.00 x 1.00 x 4,000mm long
Thermoelectric plant
Civitavecchia – Italy
Evaporator battery
F.S. deposit
Ancona – Italy
Locomotive
Sugar factory
Coruche – Portugal
Falling film evaporator
Mounting and rolling of no. 2720 tubes in Fe 35 o.d. 35.00 x 1.50 x 10,000 mm
Thermoelectric plant
Livorno – Italy
Turbine condenser
Complete retubing of no. 10,000 titanium tubes o.d. 22.00 x 0.70 x 10,000 mm long
Works performed c/o our workshop
San Biagio (Fe) – Italy
Thermoelectric plant
Piacenza – Italy
Turbine condenser
Works performed c/o our workshop
San Biagio (Fe) – Italy
Refrigerant
Integral retubing – replacement of 519 ALLBRASS pipes o.d. 19.05 x 1.24 x 10,566mm
Works performed c/o our workshop
San Biagio (Fe) – Italy
Thermoelectric plant
Piombino – Italy